Constructed a new cell site on the roof of the Canyon Road Towers residential building in Salt Lake City, UT. We installed all the required equipment needed to run the cell site in an existing mechanical room within the building. Project involved the installation of all the required electrical conduit and conductors required to power the equipment. We were required to penetrate the roof in several locations to feed the coaxial cables to the new antennae mounting locations on the rooftop. We installed three separate antennae arrays on the rooftop and painted them to match the existing color and texture of the building.

Subcontracted less than 1% of the work on this project. Major Subcontractor was Wagstaff Crane Services to lift the equipment from ground level approximately 80’ to the roof of the building.

 

  • HWY 193 to 3000 W EXTENSION – WEST POINT UTAH

    December 27, 2017

    Our team at SCI has completed the new traffic signal at the HWY 193 extension to 3000 W in West […]

    read more »

    AWOS – SPANISH FORK AIRPORT

    Last Week our team completed the AWOS “Airport Weather Observation System” at Spanish Fork Airport. What an amazing job guys! […]

    read more »