Layton Parkway Project
Project Owner: Layton City
Managing Engineering Firm: Layton City
General Contractor: Staker Parsons
Project Manager: Todd Manning
Project Location: Layton, UT.
SCI and Staker Parsons have joined forces once again to improve our community. The new Layton Parkway is an extension of the new off ramp from Flint into Angel Street, SCI was charged with building a new signal at Angel Street and install all decorative lighting on the new street. We also placed conduits and provided electrical services to give the landscape irrigation power to their system.
We installed a total of 42 “Layton City” lights and one new traffic signal placed at the intersection. SCI also placed a utopia fiber box’s and conduit along the entire route by plowing. A new run of fiber between the existing signal at Flint St. and the new signal at Angel St. also had to be installed, this was handled by SCI’s skilled ITS crews.